← Back

Critical Path

critical_path

4 CVEs • 2 products

Products (2)

Click to collapse
Toggle

CVEs (4)

CVE
VENDORS
PRODUCTS
UPDATED
PUBLISHED
CVSS
1Critical Path
1Injoin Directory Server
Apr 16, 2026
Aug 12, 2002
N/A· v4
N/A· v3
7.5 HIGH· v2
Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1)...Show more
Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters.Show less
1Critical Path
1Injoin Directory Server
Apr 16, 2026
Aug 12, 2002
N/A· v4
N/A· v3
5.0 MEDIUM· v2
iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.
1Critical Path
2Injoin Directory Server
Livecontent Directory
Apr 16, 2026
Jul 16, 2001
N/A· v4
N/A· v3
7.5 HIGH· v2
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the P...Show more
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.Show less
1Critical Path
2Injoin Directory Server
Livecontent Directory
Apr 16, 2026
Jul 16, 2001
N/A· v4
N/A· v3
7.5 HIGH· v2
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LD...Show more
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.Show less